Your extension estimate
Estimates only, not a quote. These figures use broad 2026 UK ranges. Real quotes vary a lot with ground conditions, access, materials, your region and the builder you choose, so use this to plan and to sense check real quotes, and always get at least two or three written quotes before you commit.
An extension is usually the biggest single spend a home sees, and early guesses are often far too low because fees and finishing costs get forgotten. This calculator builds the number the way a realistic budget does: build cost per square metre, then extras, professional fees and a contingency, all shown as an itemised range for the UK.
How to use it
- Pick the extension type and give the floor area, or enter length and width and let it work the area out per floor.
- Choose the finish standard and what the new space will be used for.
- Set your region. London and the South East are costed about 25 percent higher.
- Tick the extras you are planning, then read the itemised range and the midpoint. If the space is a kitchen, the fit out extra appears once you choose kitchen as the use.
How the calculation works
The build cost is the floor area times a per square metre rate for your finish standard. Side return and wraparound extensions cost a little more per metre because of the extra steel and roof work, while a double storey works out cheaper per metre because the foundations and roof are shared across two floors. A kitchen use adds a services allowance for plumbing and electrics. On top of the build and extras, professional fees are added at 10 to 15 percent (architect drawings, structural engineer, building control), and a 10 percent contingency covers the surprises every build finds. Planning a loft instead, or as well? Try the loft conversion cost calculator, and for the kitchen itself the kitchen cost calculator.
Worked example: a single storey rear extension of 20 m² at a mid range finish in the rest of the UK gives a build cost of £44,000 to £56,000. Skylights add £1,200 to £2,500. Fees at 10 to 15 percent add £4,520 to £8,780, and the 10 percent contingency adds £4,970 to £6,730. The total is £54,690 to £74,010, with a midpoint of £64,350.
Please read this before budgeting: these are broad planning estimates based on typical 2026 UK ranges, not a quote and not a promise. Ground conditions, drainage moves, steel requirements, access for machinery and your chosen builder can each move a real quote by thousands of pounds. Treat the midpoint as a planning figure and the range as your sense check when quotes come in.
Build cost per square metre by finish
| Finish | Guide per m² | What it usually means |
|---|---|---|
| Basic | £1,800 to £2,300 | Simple finishes, standard windows, basic fittings |
| Mid range | £2,200 to £2,800 | Good finishes, rooflights, quality flooring and doors |
| High end | £2,600 to £3,200 | Large glazing, premium finishes, complex detailing |
Mistakes to avoid
- Budgeting the build cost only. Fees, the kitchen or bathroom fit out and contingency can add a third or more.
- Skipping the contingency. Ground surprises and drainage moves are common, and 10 percent is a sensible minimum.
- Comparing a build only quote with an all in estimate. Ask every builder exactly what their quote includes.
- Using national averages in London. Labour and disposal costs in the capital run well above the rest of the UK.
- Forgetting the finishing tail: flooring, decorating, curtains and furniture for the new space all cost money too.
House extension cost: questions
How much does a house extension cost per square metre in 2026?
Typical UK build costs run from about £1,800 per m² for a basic finish to about £3,200 per m² for a high end finish, before extras and fees. London and the South East usually sit about 25 percent higher. Side returns and wraparounds cost more per metre than a simple rear extension.
Are professional fees included in the estimate?
Yes. The fees line adds 10 to 15 percent of the build and extras total, which is the usual allowance for architect drawings, a structural engineer, building control fees and related professional costs. A party wall surveyor, where needed, normally falls inside that allowance too.
Does the estimate include VAT?
The ranges follow published UK homeowner guides, which are generally quoted at the prices households actually pay, including VAT on labour and materials at the standard rate. Always confirm with each builder whether their quote includes VAT, because comparing one quote with and one without is a common budgeting trap.
Do I need planning permission for an extension?
Many single storey rear extensions fall under permitted development rights if they stay within size and height limits, but building regulations approval is always required. Limits differ for flats, listed buildings and conservation areas, so check with your local planning department or your architect before you rely on permitted development.
How long does an extension take to build?
A typical single storey extension takes about 10 to 16 weeks on site once work starts, with double storey and wraparound projects running longer. Drawings, approvals and builder availability come before that, so most households should allow several months from first sketches to finished room.